Kitchen renovations – Auckland
Kitchen Renovations Auckland
The building work behind the benchtop.
Kitchen renovations across the North Shore, central Auckland and the wider region where walls come out, layouts change and the trades need to run in order. Licensed Building Practitioners who will also tell you when you do not need a builder.
Kitchen renovations – Auckland
Kitchen Renovations Auckland
Looking for a kitchen renovation builder in Auckland? Cornerstone Living’s builders renovate kitchens across the North Shore, the Hibiscus Coast, central Auckland and the wider region.
We do the building side of a new kitchen: removing walls to open the kitchen to the living area, moving the sink and services, relining, new flooring, windows and doors to the outside, and coordinating the plumber, electrician, joiner and tiler so each arrives when the last one has finished.
Whether you are opening up a closed 1970s kitchen, fitting a modern kitchen into a villa without wrecking it, or replacing a tired one in the same footprint, you get an itemised quote that separates the building work from the joinery, and one person running the sequence.


The job
What a kitchen renovation involves, and when you do not need us
If your kitchen is staying exactly where it is and nothing is moving, you might not need a builder at all. A kitchen company, a plumber and an electrician can replace the cabinets, benchtop and appliances in the same positions, and it will cost you less than bringing us in.
You need a builder when the layout changes. The most common Auckland kitchen job is taking out the wall between the kitchen and the living or dining room. If that wall is load-bearing, which in most houses it is, an engineer designs the beam, Auckland Council issues a building consent, and we install the beam and props before the wall comes out.
Moving the sink or dishwasher means new drainage. On a timber floor that is straightforward from underneath. On a concrete slab it means cutting the slab, which costs more and needs planning. Either way it is restricted building work and needs consent.
The sequence is what people underestimate. Demolition, structural work, rough-in plumbing and electrical, relining and plastering, flooring, then joinery, benchtop template and install, tiling, and finally the plumber and electrician back to connect everything. One trade out of order and the whole job waits.
Benchtops come last and are templated on site after the cabinets are in, so there is usually a week or two with a temporary top. Plan for it rather than be surprised by it.
All our building services in AucklandCost
What affects kitchen renovation cost in Auckland
The joinery and appliances often cost more than the building work. We quote them separately so you can see what each is doing to the total.
Walls coming out
Each load-bearing wall needs an engineer, consent and a beam. A single opening is a modest job. Removing several walls to make one big room is a structural project and priced as one.
Moving services
A sink that stays put is cheap. A sink or island with plumbing that moves needs new drainage, and on a concrete floor that means saw-cutting the slab.
Joinery and benchtop
Flat pack, custom cabinetry, laminate, engineered stone and natural stone sit at very different price points for the same layout. This is where most of the budget choice is.
Electrical upgrades
Induction cooktops, ovens, extra circuits and an older switchboard that cannot carry them are a common addition on houses from before the 1990s.
Floors and windows
Continuing a new floor through the kitchen and living area, or adding a window or stacker door to the deck, extends the job beyond the kitchen and is priced as such.
What the wall was hiding
Old wiring, plumbing runs and rot in the bottom plate come to light when kitchen walls open up. We carry an allowance and show you what we find.
How we price it. Building work fixed from the plans, joinery and appliances quoted by the supplier and shown as separate lines, with an allowance for what is inside the walls.
Process
How a kitchen renovation runs with us
Site visit
We look at the kitchen, the walls around it, the floor type and where the services run, and talk through the layout you want.
Design and quote
Your kitchen designer or joiner draws the layout. We price the building work line by line and tell you whether a consent is needed.
Consent and ordering
Engineer’s design and building consent where a wall or services move. Joinery and appliances ordered so lead times line up with the build.
Build
Demolition, structure, rough-in, lining, flooring, joinery, benchtop, tiling and final connections, in that order, with one person running the sequence.
Handover
Everything connected and tested, council inspection where consent applied, and a walk-through together.
Related services
Work that often goes with this
Home & Villa Renovations
Whole-house renovations, villa and bungalow updates, opened-up living areas and older homes brought up to today’s standard.
Home Renovations AucklandBathroom Renovations
Strip-outs and rebuilds with the waterproofing behind the tiles done properly, because that is where bathrooms fail.
Bathroom Renovations AucklandHouse Extensions
Extra bedrooms, bigger living areas, second storeys and sleepouts added to the home you already have.
House Extensions AucklandDecks & Outdoor Living
Kwila, pine and composite decks, pergolas, louvres and covered outdoor rooms built for Auckland’s wet winters and summer UV.
Deck Builders AucklandWhy us
Why Auckland homeowners choose our builders
We will say when you do not need us
A same-layout kitchen is a joiner’s job. We tell you that at the site visit rather than quote for building work you do not need.
Trades in the right order
Plumber, electrician, joiner, stone mason and tiler are booked around each other so the job does not stall waiting for the next one.
Licensed Building Practitioners
Restricted building work is carried out or supervised by our LBPs, with a record of work for council when it is done.
One team, one sequence
Concrete, painting and landscaping come through Cornerstone Living, so the trades turn up in the right order.
Consent handled with you
We tell you what Auckland Council will want, work with your designer or engineer and manage inspections.
Updates without chasing
Progress photos and notes through the job, and a walk-through together before we call it finished.
Where we work
Where we renovate kitchens in Auckland
North Shore
Hibiscus Coast
Central Auckland
West Auckland
East Auckland
South Auckland
Questions
Questions about kitchen renovations in Auckland
Do I need a builder for a new kitchen?
Only if something structural or plumbed is moving. Same-layout replacements are done by a kitchen company with a plumber and electrician. Once a wall comes out or the sink moves, it is building work and we are the right call.
Do I need consent to remove the wall between my kitchen and lounge?
If the wall is load-bearing, yes. It needs an engineer’s beam design and a building consent from Auckland Council. Most walls in that position are load-bearing. We can usually tell at the site visit and confirm with the engineer.
How long does a kitchen renovation take?
A same-footprint kitchen is two to three weeks. A kitchen with a wall coming out and services moving is usually four to eight weeks on site, plus joinery lead time and consent processing before the start.
Can I move my kitchen to a different room?
Yes. It needs new drainage, water and power, a building consent, and often more electrical capacity. It is a bigger job than opening up the existing kitchen, and on a concrete slab the drainage work is the main cost.
Can you fit a modern kitchen in a villa?
Yes, and it is one of the most common central Auckland jobs. Villa walls are rarely plumb, floors are rarely level and the framing is undersized by today’s standards, so the building work matters more than it would in a newer house.
Will I be without a kitchen the whole time?
Yes, for most of the build. We set up a temporary bench and sink where we can, and tell you the dates so you can plan around it.
Do you supply the cabinets?
We work with your kitchen designer or joiner, or introduce you to ones we have worked with. We do the building work and run the sequence. Keeping the joinery quote separate means you can change it without changing the building price.
Planning a new kitchen in Auckland?
Send a photo of the kitchen and the wall you want gone. We will come and look at the structure and the services and tell you what it involves, with an itemised quote at no cost.
Talk to a builder today027 306 5911